CO-OPERATION, WAREHOUSE RENTAL AND MANAGEMENT

Warehouse system:

– Phase 1: Warehouse area is 19 hectares

– Phase 2: a newly 3-hectare multi-purpose, modern warehouse system; expected to be completed by 6/2025

– Meets international standards

+ Automatic fire protection system

+ CCTV system, 24/7 security control

+ Green Port Criteria: Resource-efficient use, Environmental quality and Energy-efficient management, the application of information technology, and emission reduction. The handling equipments include Shore Grane, Reach Stacker and empty container forklifts are from German with RGT system for container yard, all meet international standards.

+ Firefighting and lighting system, drainage, electrical, weighbridge, charging station, dock leveler, security and safety equipments

– Long Son International Port constantly improves the quality of surveillance information technology system equipment to improve management and connection, supporting customers to manage and look up containers at the port yard in any location.